![[personal profile]](https://www.dreamwidth.org/img/silk/identity/user.png)
![[community profile]](https://www.dreamwidth.org/img/silk/identity/community.png)

https://mass.streetsblog.org/2020/06/10/trail-advocates-plot-new-routes-to-link-e-somerville-to-charles-river/
snippet:
The trail feasibility study analyzes two critical links that would connect to the under-construction Community Path Extension, which will eventually run from Davis Square to Lechmere: one connection would run northward, linking the new Community Path to the Mystic River Greenways network near Assembly Square; the second connection would zig-zag southwest into Cambridge, and connect to the proposed Grand Junction path (which is funded and is currently being designed for construction).
Trail feasability study [PDF]: http://pathfriends.org/scp/FinalStudy/CPX_Connection_Study_200601_Report-small.pdf